What we are doing
In April 2025, we opened the Bowood Lane overbridge for use as a Public Right of Way (PRoW). In August 2025, we will be undertaking construction of an asphalt joint across the full width of the carriageway on the overbridge. For the safety of the public, we will be required to temporarily close the PRoW for five
days to complete these works. As soon as the works are completed the PRoW will be opened.
When will these works take place?
• Monday 4 August – Friday 8 August 2025
These dates may be subject to change due to circumstances outside of
our control but works will be completed in or around the set timeframes.