What we are doing
To assist our design of the HS2 railway, we need to carry out surveys in the area. These surveys will include inspecting the condition of existing drainage infrastructure using CCTV cameras.
To complete this work safely, we will install traffic management along short sections of Attleboro Lane on Monday 31 October and Tuesday 1 November, from 9.30am until 4.00pm. Access for residents and pedestrians will be maintained throughout. Our workforce may be on site one hour before or one hour after to set up and take down equipment.