Notice of temporary road closure on Gravenhunger Lane for pre survey work
Work item: HS2-EW-KIER-Ph2a-Ar-CA05-Surv-23-28/1/2022
Work Item Summary
- Project Phase
- Phase 2a
- Region
- Cheshire, Crewe
- Location
- Gravenhunger Lane
- Worksite Name
- Gravenhunger Lane
- Contractor
- Kier
- Type of works
- Ground investigations, Survey
- Estimated Start Date
- 13/02/2022
- Estimated End Date
- 13/02/2022
What we are doing
We will be carrying out pre survey work to help us undertake light detection and ranging (LIDAR) surveys. This pre surveys work is non-intrusive and involves putting targets on the road and footpaths.
On a different day a helicopter will be in the area to accurately measure distances between the targets. This will allow for a 3D model of the terrain to be created.
When the work will take place
The temporary closure will take place on Gravenhunger Lane between 9am and 4pm Sunday 13 February 2022 and last around 15 minutes. Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances. We will notify you in advance of any changes.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]