Notice of temporary traffic lights along Station Road, Coleshill

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-50-31/08/2022

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Coleshill
Contractor
BBV JV
Type of works
Utility works / surveys
Estimated Start Date
26/09/2022
Estimated End Date
27/09/2022

What we are doing

To assist our design of the future HS2 railway, we need to carry out surveys in the area. These surveys will include inspecting the condition of existing drainage infrastructure using CCTV cameras. To conduct our surveys safely, we will install temporary traffic measures in the area when required.
To safely carry out CCTV surveys near Coleshill Parkway Train Station, we will install temporary traffic lights along a short section of Station Road from 9.30am to 3.30pm on Monday 26 September and Tuesday 27 September.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]