What we are doing

To continue the preparation of our construction works for the HS2 railway, we need to carry out surveys in the area. These surveys will include inspecting the condition of existing drainage infrastructure using CCTV cameras as well as boring trial holes to inspect the existing utilities. All trial holes will be reinstated.

To conduct our surveys safely, we will install two-way and three -way temporary traffic lights along Gilson Road and Gilson Drive. The traffic management will be installed in a rolling system, covering 150 metre sections at a time, from Wednesday 4 January until Monday 16 January.

The location of traffic management is shown in the map below. Our working hours will be 9.30am to 3.30pm, from Monday to Friday.