Notice of Temporary traffic lights Truggist Lane, Berkswell
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-9-23/06/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Solihull, West Midlands
- Location
- Balsall Common
- Contractor
- BBV JV
- Type of works
- Survey, Traffic management
- Estimated Start Date
- 12/07/2021
- Estimated End Date
- 30/07/2021
What we are doing
BBV will be carrying out trial hole excavations in the existing verge of Truggist Lane near to Berkswell railway station bridge up to the junction of Baulk Lane. This is to identify existing utility services, construct protection slabs over existing utility services and construct a plant crossing for site traffic to cross Truggist Lane. To ensure the safety of our workforce BBV will work behind a lane closure which will by controlled by 4 way traffic lights replacing the permanent lights which will be powered off during this period. The temporary lights will be vehicular activated to minimise waiting time during off peak traffic flows.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]