Skip to main page content
View route map

Notice of traffic lights and construction work, A423, Southam

Work item: HS2-MW-EK-Ph1-Ar-Ce-C1-Traf-30-14/08/2024

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Southam
Worksite Name
A423
Type of works
Construction, Traffic management
Estimated Start Date
31/08/2024
Estimated End Date
01/09/2024

What we are doing

South of Southam EKFB are building two new bridges. As part of the construction of the A423 overbridge, we are building new drainage culverts near the highway and installing a support method called sheet piling.

This involves driving interlocking metal sheets into the ground, to create a strong retaining wall between the structure and the highway.

To complete this work safely, there will be a single lane closure on the A423, managed with temporary traffic lights. An increase in noise maybe experienced while this work is carried out.

When will these works take place?

Saturday 31 August and Sunday 1 September 2024, from 8.30am to 5.30pm.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]