Notice of traffic lights and road closure Rugby Road, Cubbington

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-18-01/04/2022

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire, West Midlands
Location
Cubbington
Worksite Name
Rugby Road
Contractor
BBV JV
Type of works
Road closure, Traffic management
Estimated Start Date
02/05/2022
Estimated End Date
01/06/2022

What we are doing

Notice of traffic lights and road closure Rugby Road, Cubbington

So that our vehicles don’t cause damage to the road, we will be making improvements to the road surface by installing a plant crossing on Rugby Road. This crossing will allow the use of our haul road in this area. Haul roads are temporary roads provided within a working area to allow for the movement of construction materials, construction machinery and/or construction staff around the site. Haul roads are Balfour Beatty Vinci’s preferred logistical transport link, as they reduce the number of vehicle movements interfering with the existing local road network and provide the greatest possible control over works activity. To allow us to carry out these works safely, two-way traffic lights will be in place 24 hours a day, seven days a week from Monday 2 May until Friday 20 May, this will be followed by a total closure from Monday 23 May to Wednesday 1 June. The closure will be in place from 9.30am to 3.30pm on weekdays, reverting to traffic light control outside of these hours.

Access will be maintained to all properties while these works are being carried out.

A fully signed diversion will be in place as required during these works.

Please note, Fosse Way will also be closed from 30 April to end of May.