What we are doing
We are constructing haul roads and accesses within Lea Marston. Haul roads are temporary roads provided within a working area to allow for the movement of construction materials, construction machinery and/or construction staff around the site. Haul roads are Balfour Beatty VINCI’s preferred logistical transport link, as they reduce the number of vehicle movements interfering with the existing local road network and provide the greatest possible control over works activity.
To allow our vehicles to access our work area safely on Hams Lane and to maintain the safety of road users, equestrian and pedestrians, we will create an entrance to our working area. To enable us to complete these works we will require a temporary lane closure on Hams Lane.
We will complete these works from Monday 14 November until Friday 25 November 2022. These works will require a lane closure on Hams Lane between 9.30am to 3.30pm (Monday – Friday). Pedestrian and equestrian access will be maintained during this period.