Notice of traffic management on South Drive, Coleshill
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-UT-32-14/07/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire, West Midlands
- Location
- Coleshill
- Worksite Name
- South Drive
- Contractor
- BBV JV
- Type of works
- Traffic management
- Estimated Start Date
- 08/08/2022
- Estimated End Date
- 11/08/2022
What we are doing
In order to progress the design for HS2, BBV need to carry out a survey of the existing street lighting along South Drive. To carry out these works safely, traffic management will be using “Stop and Go” boards to manage the traffic along South Drive.
The works will take place between 08 August and 11 August. The traffic management will be used off peak and the works will take place between 9.30am and 3.30pm.