Notice of utilities work at Cedar Avenue and Great Central Avenue
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-50-29/01/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip, South Ruislip
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 15/03/2021
- Estimated End Date
- 17/03/2021
What we are doing
From 15 March 2021, we will be carrying out ground and sewer system investigation at Cedar Avenue and Great Central Avenue, in the area shown on the map in our works notification, available to view or download below. This will help to inform our design decisions in the area.
The ground investigation will involve the use of scanning equipment to identify the utilities in the area. We will be excavating trial holes to take measurements and ground samples.
To investigate the condition of the sewer system and the manholes, we will be using a CCTV camera mounted on a small robot. Should we find a blockage we may need to flush the drainage system using a high-pressure water jet in order to carry out the investigation.