Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire
- Location
- Water Orton
- Contractor
- UK Power Networks
- Type of works
- Utility works / surveys
- Estimated Start Date
- 18/01/2021
- Estimated End Date
- 31/10/2021
What we are doing
In order to construct the railway it is necessary to divert a number of High Voltage Electricity cables currently situated in the vicinity of the proposed HS2 infrastructure. Due to the extensive development works in and around the area associated with the Water Orton viaduct construction. Western Power Distribution will be diverting two existing High Voltage Cable circuits through the Severn Trent Water sewage works land in Coleshill.
Download information relating to these works