Work item: HS2-MW-BBV-Ph1-Ar-No-N2-UT-42-04/11/2023

Work Item Summary

Project Phase
Phase 1
Region
Birmingham, West Midlands
Location
Bromford
Contractor
BBV JV
Type of works
Utility works / surveys
Estimated Start Date
27/04/2023
Estimated End Date
25/05/2023

What we are doing

In order to construct the railway we need to carry out a programme of utility diversions. Initially, these will take place on Tameside Drive from Thursday 27 April for approximately 4 weeks. Following this, there will be utility diversions on the A452 Chester Road, however, we will notify you of these works nearer the time.

To carry out the utility diversions safely, we need to manage traffic and pedestrians in the area. We’ll carry out the utility diversions in phases, rather than all at once, to keep disruption to a minimum.

Tameside Drive: Phase 1
During this phase of work, there will be temporary traffic signals in place and operatives on site throughout to ensure safe access is maintained at all times (please see the map on page 2 for the location of the works).
These works will take place between the hours of 8am and 6pm from Monday to Saturday.

Tameside Drive: Phase 2
During this phase of work, there will be temporary traffic signals in place and operatives on site throughout to ensure safe access is maintained at all times (please see the map on page 2 for the location of the works).
These works will take place between the hours of 8pm and 6am from Monday to Friday.