Notice of utility surveys at Bridgwater Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-3-23/03/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip
- Contractor
- SCS JV
- Estimated Start Date
- 06/04/2021
- Estimated End Date
- 06/04/2021
What we are doing
What we are doing
On Tuesday 6 April, we will be carrying out sewer system investigations along Bridgwater Road, in the area shown on the map overleaf. This will help to inform our design decisions in the area.
We will investigate the condition of the sewer system and the manholes using a CCTV camera mounted on a small robot. Should we find a blockage we may need to flush the drainage system using a high-pressure water jet in order to carry out the investigation.
How the surveys might affect you
The surveys will be carried out below street level, therefore temporary traffic management will be in place to ensure the surveys can be carried out safely. Your utility services will not be affected.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]