Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-3-23/03/2021

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Ruislip
Contractor
SCS JV
Estimated Start Date
06/04/2021
Estimated End Date
06/04/2021

What we are doing

What we are doing

On Tuesday 6 April, we will be carrying out sewer system investigations along Bridgwater Road, in the area shown on the map overleaf. This will help to inform our design decisions in the area.
We will investigate the condition of the sewer system and the manholes using a CCTV camera mounted on a small robot. Should we find a blockage we may need to flush the drainage system using a high-pressure water jet in order to carry out the investigation.

How the surveys might affect you

The surveys will be carried out below street level, therefore temporary traffic management will be in place to ensure the surveys can be carried out safely.  Your utility services will not be affected.