Notice of utility surveys at the junction of May Gardens and Alperton Lane
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-1-14/02/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Old Oak and North Acton
- Location
- Old Oak
- Worksite Name
- Old Oak Common
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 28/02/2022
- Estimated End Date
- 11/03/2022
What we are doing
Utility surveys in your local area
During February and March 2022, we will be carrying out utility surveys in your local area. The surveys are needed to investigate the condition of the utility services and consider the best way to protect these while we build the HS2. More information about the survey locations and temporary changes in place during the surveys is included on the following pages.
We will use a combination of power and handheld tools during these works. Where required, our team will use noise blankets to minimise disruption to you.
Please note the dates for the surveys may change. You can view our latest works updates at www.hs2.org.uk/in-your-area/map
We will write to you in advance of any further surveys in your local area.
Speak with our local engagement team
Our local engagement team is happy to arrange a time to speak with you via phone if you have any questions about the surveys. Please contact the HS2 Helpdesk via the contact details below to arrange this.
Our local engagement team is also available at virtual 1:1s for local residents on the fourth Wednesday of each month between 3pm and 6pm. Visit www.hs2.org.uk/events/ to register for a 20-minute 1:1 with our local engagement team.
28 February to 4 March 2022:
Surveys planned at the junction of May Gardens and Alperton Lane
From 28 February to 4 March, we will dig a trial hole (a temporary trench) to confirm the location of utilities below the road surface at the junction of May Gardens and Alperton Lane.
The surveys will take place between 8am and 6pm. A road closure will be in place at the junction of May Gardens and Alperton Lane.
Due to the trial hole in the road surface, the road closure will remain in place for the duration of these surveys.
7 to 11 March 2022:
Surveys planned at junction of May Gardens and Alperton Lane
From 7 to 11 March 2022, we will dig a trial hole (a temporary trench) to confirm the location of utilities below the footway at the junction of May Gardens and Alperton Lane. The surveys will take place between 8am and 6pm. A lane and footway closure will be in place at the junction of May Gardens and Alperton Lane.
Temporary traffic lights will be in place near the lane closure to maintain traffic flow. A pedestrian route will be clearly signed. Due to the trial hole in the footway surface, the footway closure will remain in place at all times during these dates.
Further surveys in your local area
We will be carrying out further utility surveys on May Gardens and Alperton Lane during March and April 2022. The details of these surveys are still being confirmed. We will write to you with information as soon as possible. You can view our latest works updates at www.hs2.org.uk/in-your-area/map
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]