Notice of utility surveys near Blenheim Crescent
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-31-30/03/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 06/04/2021
- Estimated End Date
- 09/04/2021
What we are doing
What we are doing
From 6 to 9 April 2021, we will be carrying out sewer system investigations along the rail tracks south of Blenheim Crescent, in the area shown on the map overleaf. This will help to inform our design decisions in the area.
We will investigate the condition of the sewer system using a CCTV camera mounted on a small robot. Should we find a blockage, we may need to flush the drainage system using a high-pressure water jet in order to carry out the investigation.
To ensure the safety of operatives and rail users, these works will take place at night during a rail possession.
How the surveys might affect you
You may see people operating the along railway tracks. Your utility services will not be affected.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]