Notice of utility surveys on Brunswick Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-01/02/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Location
- Ealing
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 13/02/2023
- Estimated End Date
- 10/03/2023
What we are doing
We will be carrying out overnight ground penetrating radar (GPR) surveys on Brunswick Road on 13 February 2023 between 8pm and 6am. After the GPR surveys, we will carry out ground investigations from 27 February to 10 March 2023 between 8am to 6pm Monday to Friday and 8am to 1pm, Saturdays, if required.
The ground investigations will consist of digging a temporary trench to confirm the location of utilities under the surface of the road and footpath. The investigations will help us to understand the best ways to protect or divert any utilities during construction, and aid the design of the new railway.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]