Skip to main page content
View route map

Notice of utility surveys on Brunswick Road

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-01/02/2023

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing
Location
Ealing
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
13/02/2023
Estimated End Date
10/03/2023

What we are doing

We will be carrying out overnight ground penetrating radar (GPR) surveys on Brunswick Road on 13 February 2023 between 8pm and 6am. After the GPR surveys, we will carry out ground investigations from 27 February to 10 March 2023 between 8am to 6pm Monday to Friday and 8am to 1pm, Saturdays, if required.

The ground investigations will consist of digging a temporary trench to confirm the location of utilities under the surface of the road and footpath. The investigations will help us to understand the best ways to protect or divert any utilities during construction, and aid the design of the new railway.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]