Notice of water connection works at Mandeville Road

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-26-02/01/2021

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing
Location
Northolt
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
05/03/2021
Estimated End Date
15/03/2021

What we are doing

From Friday 19 February 2021, we will be carrying out water connection works in the area shown on the map in the below PDF notice. This will help us to install the water supply that will be used throughout our works site. Affinity Water will install the water supply at the entrance of Mandeville Road Vent Shaft site. These works will include the excavation of a trench to install connection pipes.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]