Notice of works at West Ruislip Portal site
Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Prog-works-11-12/07/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- West Ruislip
- Worksite Name
- West Ruislip
- Contractor
- SCS JV
- Type of works
- Steel fixing work
- Estimated Start Date
- 29/12/2021
- Estimated End Date
- 31/12/2021
What we are doing
What we are doing
On the 29, 30 and 31 of December 2021, we will be carrying out steel fixing works on the tunnel portal area at our West Ruislip site.
These works will be done within our site boundary at 11 meters below ground level therefore, we do not anticipate any noise or disruption.
Steel fixing is the activity that takes place to create many of the steel support structures that are used in the construction of the railway, the work comprises a crane lifting materials into the excavation below ground and then operatives manually fixing these lengths of steel in place. An example image is included on the page overleaf which shows a similar operation.
Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.
Download information relating to these works