What we are doing
Sewer surveys on Robert Street and Hampstead Road between 13 and 17 March 2023
As part of our essential programme of utilities works, we need to carry out CCTV surveys on the existing sewer to check its condition and collect information to assist with design works. The sewer manhole is located on Robert Street within the existing temporary work site and also at the junction of Hampstead Road/ North Gower Street.
Access to the manhole to carry out these surveys is required for approximately four nights in mid-March 2023. These surveys can only be carried out at night given that water flows are lower which means we can collect more accurate survey results. For location and traffic management details, please refer to the plan attached, below.