Notice of works to repair cobblestones on Curzon Street
Work item: HS2-MW-MD-Ph1-Bir-Cur-St-N4-Prog-works-1-11/10/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Birmingham, West Midlands
- Location
- Birmingham, Curzon Street
- Worksite Name
- Curzon Station
- Contractor
- Mace Dragados JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 27/10/2023
- Estimated End Date
- 29/10/2023
What we are doing
In preparation for the construction of HS2’s Curzon Street Station and the railway, Mace Dragados (MDJV) we will be carrying out works outside the pedestrian site entrance at gate 2 on Curzon Street.
The team will temporarily remove loose cobblestones and make the area safe with an interim reinstatement.
To carry out these works safely we will need to put in place a lane restriction on Curzon Street just outside the site entrance. The footpath on this section of Curzon Street is currently closed to pedestrians.
Pedestrian access will be maintained during these works but in some locations, there may be temporary footpath alterations.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]