Notice of works to repair cobblestones on Curzon Street

Work item: HS2-MW-MD-Ph1-Bir-Cur-St-N4-Prog-works-1-11/10/2023

Work Item Summary

Project Phase
Phase 1
Region
Birmingham, West Midlands
Location
Birmingham, Curzon Street
Worksite Name
Curzon Station
Contractor
Mace Dragados JV
Type of works
Utility works / surveys
Estimated Start Date
27/10/2023
Estimated End Date
29/10/2023

What we are doing

In preparation for the construction of HS2’s Curzon Street Station and the railway, Mace Dragados (MDJV) we will be carrying out works outside the pedestrian site entrance at gate 2 on Curzon Street.

The team will temporarily remove loose cobblestones and make the area safe with an interim reinstatement.

To carry out these works safely we will need to put in place a lane restriction on Curzon Street just outside the site entrance.  The footpath on this section of Curzon Street is currently closed to pedestrians.

Pedestrian access will be maintained during these works but in some locations, there may be temporary footpath alterations.

 