Notice of works to repair footpath on Canterbury Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-CR-2-07/07/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Location
- Canterbury Road
- Worksite Name
- Canterbury House
- Contractor
- SCS JV
- Type of works
- Footpath closures
- Estimated Start Date
- 07/07/2021
- Estimated End Date
- 19/07/2021
What we are doing
Maintenance work on site entrance
From 7 July to 19 July 2021, we will be carrying out work to repair the damaged footpath and ramp next to our site entrance on Canterbury Road. These works are needed to ensure that the poor state of the footpath does not become a safety issue for both local residents, pedestrians and our staff.
A map showing the location of these works is included on the next page.
Work will take place between the hours of 8am and 6pm weekdays and 9am and 5pm on Saturday 10 July.
We will be using an excavator to break and remove the current footpath and curbs, and the access ramp to site. We will then build a new footpath and access ramp with new concrete, tarmac and curbs.
We will use noise barriers and water sprays to minimise noise and dust during these works
Dates mentioned in this notification may change due to unforeseen circumstances. We will continue to provide updates about our works at HS2inKilburn-Northolt.co.uk