Notification of upcoming road closure Coventry Road, Cubbington
Work item: HS2-EW-BBV-Ph1-Ar-No-N2-Prog-works-20-06/09/2022/RN
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire, West Midlands
- Location
- Cubbington
- Worksite Name
- Coventry Road
- Contractor
- BBV JV
- Type of works
- Haul road construction, Plant crossing, Road closure
- Estimated Start Date
- 07/03/2022
- Estimated End Date
- 01/04/2022
What we are doing
We will be creating a plant crossing on Coventry Road, Cubbington for our haul road. Haul roads are temporary roads provided within a working area to allow for the movement of construction materials, construction machinery and/or construction staff around the site. Haul roads are Balfour Beatty Vinci’s preferred logistical transport link, as they reduce the number of vehicle movements interfering with the existing local road network and provide the greatest possible control over works activity.
This crossing will allow us to safely move our construction plant across the road as we undertake various earthworks in the area.
In order for us to create the plant crossing safely it is necessary for us to close Coventry Road, Cubbington. A fully signed diversion will be in place during this closure and access to all properties will be maintained during these works.
The closure will take place from Monday 7 March to Friday 1 April. The road will be closed Monday to Friday between the hours of 9.30am to 3.30pm, with temporary traffic lights in operation outside of these times. Our workforce may be on site for one hour before and one hour after to set up and secure our equipment.
NB. These works were due to be completed on Saturday 26 March but due to Circumstances beyond our control these works have been extended to Friday 1 April.
Download information relating to these works