What we are doing
Align JV is currently building the 3.4km Colne Valley viaduct from the North Embankment at Denham in Buckinghamshire to the South Embankment near Harvil Road in Hillingdon. The decking of the viaduct over Moorhall Road is complete.
We now need to install noise barriers along the top of the deck. We have already installed some noise barriers along the viaduct, as illustrated below, but to install the sections safely over the public highway we need to close Moorhall Road from the junction with Link Road / Savay Lane to the entrance of Widewater Place.
The road will be closed to all users overnight from Monday 27 January to Sunday 2 February 2025, between 10pm to 5am every night.