Overnight installation of rainbow crossing on Victoria Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-1-014/06/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Old Oak and North Acton
- Location
- Old Oak
- Worksite Name
- Old Oak Common
- Contractor
- SCS JV
- Type of works
- Installation Works, Road closure
- Estimated Start Date
- 19/06/2022
- Estimated End Date
- 20/06/2022
What we are doing
Overnight installation of rainbow crossing
In March 2022 SCSJV painted the iconic rainbow symbol at a crossing point on Victoria between the Holbrook building and the former Castle Pub. Unfortunately, due to the crossing being damaged, we will be repainting the markings of the rainbow crossing.
Temporary overnight Road changes on Victoria Road
To carry out these works safely and minimise the impact to the road network, work will take place overnight on 19 June between the hours of 10pm and 5am the morning of 20 June 2022. During these works we will need to close a section of road on Victoria Road to re-paint the crossing markings. A signed vehicle diversion route will be in place during.
We will also need to temporarily close bus stop North Action Station (Stop Z) next to the Holiday Inn Express on Victoria Road overnight. The next closest stops are Chase Road North Acton (Stop U), North Acton Station (Stop B) and Wales Farm Road (Stop C).
Further details of the road changes can be found on the following page.
Speak to our local engagement team Your local engagement team are happy to speak with you in person or virtually about any questions or concerns you have about our works in your local area.
We hold virtual drop-ins on the fourth Wednesday of each month. Our next virtual drop in is on Wednesday 29 June 2022– you can register to attend at www.hs2.org.uk/events/ . Please contact the HS2 Helpdesk If you are not able to attend the virtual drop-in and would like to speak with us at another time.
We are also planning on holding face-to-face drop-ins from summer 2022 and will let the community know when the details are confirmed.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]