Overnight road closure on Breakspear Road South
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-1-03/01/2023_03
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon, London
- Location
- Breakspear Road South
- Worksite Name
- West Ruislip
- Contractor
- SCS JV
- Type of works
- Construction
- Estimated Start Date
- 15/03/2023
- Estimated End Date
- 20/03/2023
What we are doing
Works along Breakspear Road South, north and south of the Network Rail bridge will take place overnight from 15 to 20 March 2023.
The works will include the following activities:
• concrete pour for the deck of the new bridge over Breakspear Road South;
• utility investigation works between the HS2 bridge and the Network Rail bridge;
• installation of the conveyor bridge (for the removal of tunnel excavation arisings from West Ruislip Portal to the Southern Sustainable Placement Area). These works are dependent on weather conditions and we will therefore need to work 25 and 26 March to complete the installation; and
• installation of road line markings and highways signage onto the masonry of the Network Rail bridge.
During the road closure access will be maintained for residents and emergency services.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]