Overnight works at Mandeville Road site
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog works-1-21/04/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Worksite Name
- Mandeville Road
- Contractor
- SCS JV
- Type of works
- Cable works
- Estimated Start Date
- 07/05/2022
- Estimated End Date
- 21/08/2022
What we are doing
Overnight working
From Saturday 21 May to Saturday 20 August 2022, we will be installing new track drainage and cable troughing next to the rail line, outside of the site hoarding line.
This work is taking place overnight each Saturday from 5pm to Sunday 5pm in a planned closure of the Network Rail line. The Central Line is not affected by this work and will still be in operation.
In order to install the drainage and troughing, we will be using an excavator that sits on the rail track and excavates parallel to the existing rail line. Materials and new drainage will also be lifted into position using the excavator.
In order to undertake these works, we will be using mains lighting where possible to illuminate the localised area of the work. However we may need to use a small mobile generator to provide lighting at particular times.
The work is down in the railway cutting so noise and lighting should cause minimal effect on residential properties. We will continue to review the lighting over this time.
How these works might affect you
We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]