Pipework installation between South Ruislip and Yeading Brook

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog works-1-28/4/22

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip
Worksite Name
South Ruislip
Contractor
SCS JV
Type of works
Dewatering works, Pipework installation
Estimated Start Date
09/05/2022
Estimated End Date
01/07/2022

What we are doing

What we are doing
From 9 May to 1 July 2022, we will be installing pipework along the railway embankment from our site in South Ruislip to Yeading Brook.

The pipe will be used to remove groundwater from the site to Yeading Brook and will be carried out in two phases.

The first phase of the pipe installation will be from our South Ruislip site to the bridge at Bridgwater Road. Material for this work will be transported by hand via site. A non-powered track trolley will also be used along the adjacent network Rail line.

We will then move on from Bridgwater Road and continue towards Yeading Brook.

Work will be carried out during core hours, Monday to Friday 8am – 6pm and Saturday 8am to 1pm, however there may be periods when installation within either section will be undertaken at night as required by Network Rail.

How the work might affect you
We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]