Reconnecting the TfL depot bridge near Herlwyn Avenue
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-OTH-1-31/07/23
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Herlwyn Avenue
- Worksite Name
- South Ruislip
- Contractor
- SCS JV
- Type of works
- Bridge works
- Estimated Start Date
- 14/08/2023
- Estimated End Date
- 15/09/2023
What we are doing
What we are doing
We have progressed with our tunnelling works in this area and can now reconnect the Transport for London (TfL) depot bridge located trackside at the rear of Herlwyn Avenue.
Please see the map overleaf for the precise location and details of the works to be carried out.
How these works might affect you
We will need to access the area via the turnstile off Herlwyn Avenue (shown on the map overleaf). We will ensure that vehicles collecting materials are there for the shortest time possible. However, there will be two transit vans supporting these works parked on the street.
The bridge reconnection element of these works will need to take place overnight when trains are not running.
We would like to apologise in advance for the disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.
We will ensure that disruption is kept to a minimum.