Reconnecting the TfL depot bridge near Herlwyn Avenue

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-OTH-1-31/07/23

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Herlwyn Avenue
Worksite Name
South Ruislip
Contractor
SCS JV
Type of works
Bridge works
Estimated Start Date
14/08/2023
Estimated End Date
15/09/2023

What we are doing

What we are doing
We have progressed with our tunnelling works in this area and can now reconnect the Transport for London (TfL) depot bridge located trackside at the rear of Herlwyn Avenue.

Please see the map overleaf for the precise location and details of the works to be carried out.
How these works might affect you
We will need to access the area via the turnstile off Herlwyn Avenue (shown on the map overleaf). We will ensure that vehicles collecting materials are there for the shortest time possible. However, there will be two transit vans supporting these works parked on the street.

The bridge reconnection element of these works will need to take place overnight when trains are not running.

We would like to apologise in advance for the disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.

We will ensure that disruption is kept to a minimum.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]