Work item: HS2-MW-MD-Ph1-Eu-St-S3-Prog-works-16-01/04/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Camden, London
- Location
- Camden
- Worksite Name
- Euston Station
- Contractor
- Mace Dragados JV
- Type of works
- Enabling works
- Estimated Start Date
- 15/04/2022
- Estimated End Date
- 30/09/2022
What we are doing
Removal of concrete slabs
Enabling works need to be carried out within the future footprint of the HS2 Euston station. These activities are
all within the site boundary and are anticipated to commence from late-April to autumn 2022.
The first of these activities include demolition of the former Ibis Hotel basement slab – see map below for site area. This will be carried out from late-April 2022 and will involve the use of a 20t excavator, 35t excavator with breaker and a vacuum excavator, where required.
We appreciate works can be noisy, and we have therefore included noise and vibration control measures to limit its impact. This includes high perimeter hoarding and where practicable, Heras fence panels will be fitted with acoustically absorbent blankets and placed around high noise emission activities.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]