Removal of Pipework between South Ruislip and Yeading Brook

Work item: HS2-MW-SCS-Ph1-Ar-So-S1-Traf-33-09/04/2024

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip
Worksite Name
South Ruislip
Contractor
SCS JV
Type of works
Pipework removal
Estimated Start Date
06/05/2024
Estimated End Date
05/07/2024

What we are doing

What we are doing
We wrote to you in May 2022, to let you know that ahead of the start of tunnelling, we would be installing pipework along the railway embankment from our site in South Ruislip to Yeading Brook. We’ve been using the pipe to support our tunnelling activities. We now no longer need to use it.

From 6 May to 5 July, we will be removing the pipework in two phases:
Phase one: 6 May to 24 May – South Ruislip Vent Shaft to the bridge on Bridgwater Road.

Phase two: 27 May to 5 July – Bridgwater Road to Yeading Brook. Access for materials and plant for this phase will be through the Bridgwater Road fields.

What to expect
During these works, we will be using an excavator, a dumper and small hand tools. We’ll use a transit van to transport people to the works location.

We would like to apologise for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]