Road closure and temporary traffic lights on B485 Chesham Road, Buckinghamshire
Work item: HS2-MW-Align-Ph1-Ar-Ce-C1-Traf-21-19/10/2023
Work Item Summary
- Project Phase
- Phase 1
- Location
- B485
- Contractor
- UK Power Networks
- Type of works
- Lane closure, Road closure, Utility works / surveys
- Estimated Start Date
- 23/10/2023
- Estimated End Date
- 03/11/2023
What we are doing
UK Power Networks will be carrying out electrical connection works for our Chesham Road site. To locate and connect these cables safely, the highway will need to be closed for excavation.
From Monday 23 to Monday 30 October there will be a full road closure and from Monday 30 October to Friday 3 November there will be a single lane closure and two way traffic lights.
Please follow the signed traffic diversion that will redirect motorists via the A413, B4009, A41 and A416. This closure will not affect HS2 traffic to our site, which will continue to use the approved route which is via the A413.
Please see notification for more information.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]