Road closure and temporary traffic lights on B485 Chesham Road, Buckinghamshire

Work item: HS2-MW-Align-Ph1-Ar-Ce-C1-Traf-21-19/10/2023

Work Item Summary

Project Phase
Phase 1
Location
B485
Contractor
UK Power Networks
Type of works
Lane closure, Road closure, Utility works / surveys
Estimated Start Date
23/10/2023
Estimated End Date
03/11/2023

What we are doing

UK Power Networks will be carrying out electrical connection works for our Chesham Road site.  To locate and connect these cables safely, the highway will need to be closed for excavation.

From Monday 23 to Monday 30 October there will be a full road closure and from Monday 30 October to Friday 3 November there will be a single lane closure and two way traffic lights.

Please follow the signed traffic diversion that will redirect motorists via the A413, B4009, A41 and A416. This closure will not affect HS2 traffic to our site, which will continue to use the approved route which is via the A413.

Please see notification for more information.