Road closure, Crackley Lane, Kenilworth
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Prog-works-43-01/04/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire, West Midlands
- Location
- Kenilworth
- Worksite Name
- Crackley Lane
- Contractor
- BBV JV
- Type of works
- Ground investigations, Road closure
- Estimated Start Date
- 04/01/2022
- Estimated End Date
- 06/01/2022
What we are doing
BBV will be undertaking Ground Investigations (GI) along Crackley Lane. GI is the examination and study of the soil, rocks, and groundwater below the surface. Several methods are used to obtain samples and to monitor and test them. For example, boreholes may be dug by hand around utility pipelines or by using a rig in more open areas. GI may also require the digging of a trial pit or trench. Ground data from GI will ensure that the contractors designing and building the main works can do so safely, economically, and efficiently. The information will also reduce the risk of encountering unexpected ground conditions during construction. Crackley Lane will be closed from 4 January 2022 to 6 January 2022, between 8am and 6pm. Our workforce may be on site an hour before and an hour after those times to set up and secure our equipment. A fully signed diversion will be in place during this time.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]