What we are doing
Sheet piling
From 8 November to 3 December 2021, we will be installing sheet piling close to the boundary of the northern edge of our site, as detailed on the map below.
In order to install the sheet piling we will need to remove a small section of the existing hoarding, adjacent to Carr Road access track, as the concrete blocks for the hoarding are in close proximity to this work. We will replace the hoarding with heras fencing with a noise reducing cover to help manage the noise from site.
How these works might affect you
You may notice periods of increased noise during these works due to the reduced height in the fencing along the site boundary. We would like to apologise in advance for any disruption or
inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.