Single lane closure on B4118 Birmingham Road for improvement works
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Prog-works-40-02/12/2023
Work Item Summary
- Project Phase
- Phase 1
- Location
- Water Orton
- Contractor
- BBV JV
- Type of works
- Road repairs
- Estimated Start Date
- 26/02/2024
- Estimated End Date
- 01/03/2024
What we are doing
We will be operating temporary two-way traffic lights along the B4118 Birmingham Road, Water Orton, from Monday 26 February 2024 until Friday 1 March 2024. The traffic lights will be operational during offpeak hours only (9.30am – 3.30pm). We need to use the traffic lights to carry out improvement works on the road.
We will be re-modelling the road and installing street lighting, cabinets for telecommunications equipment, digital signage and other street furniture. To complete this, we will be using a vacuum excavator which uses compressed air to loosen or agitate the ground. We then remove the loosened material under the vacuum as the machine creates a hole.
To minimise disruption on the road network, we will divide our works in phases so that once a phase is complete we will move on to the next.