Station Approach night-time installation of bridge monitoring equipment

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-OTH-1-6/12/23

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip, Station Approach
Worksite Name
South Drive
Contractor
SCS JV
Type of works
Bridge monitoring equipment installation
Estimated Start Date
13/01/2024
Estimated End Date
14/01/2024

What we are doing

What we are doing
Overnight on Saturday 13 and Sunday 14 January 2024, we will be installing monitoring equipment on the underside of the railway bridge on Station Approach.
We will erect a tower scaffold within the work areas shown on the map overleaf so that we can carry out the installations safely.

How these works might affect you
There will be a lane and pedestrian footpath closure so that we can work safely during the installation of the equipment. Temporary traffic lights and pedestrian crossings will be in place during this time. This arrangement will be swapped to the other side of the road so that we can install the monitoring equipment on the opposite underside of the bridge.

We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way and we will ensure that disruption is kept to a minimum.