Update: Swiss Cottage open space manhole surveys

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Tun -1-25/09/2024_02

Work Item Summary

Project Phase
Phase 1
Location
Swiss Cottage open space
Contractor
SCS JV
Type of works
Survey
Estimated Start Date
02/12/2024
Estimated End Date
06/12/2024

What we are doing

We wrote to you in October about our survey of a number of manholes in the pathways around Swiss Cottage Open Space. Due to a small number of the access covers being stuck, we need to return to lift these with a small mechanical device.

We’ll now undertake these works from 2 to 6 December 2024, 8am to 6pm.

The team will set up plastic pedestrian barriers around each manhole cover in order to ensure the works are segregated from the public. Pedestrian access will be maintained around the work area at all times.

Welfare vehicles will be parked nearby during this work. A small number of operatives will be working in the area. We would like to apologise in advance for the disruption or inconvenience this may cause.

For further details and location map please see notification below.

Download information relating to these works