TBM material storage on Harvil Road

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Tun-2-16/11/2022

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Harvil Road
Worksite Name
Copthall
Contractor
SCS JV
Type of works
TBM Associated Works
Estimated Start Date
01/12/2022
Estimated End Date
30/04/2023

What we are doing

What we are doing
From 1 December 2022 to April 2023, we will store TBM materials on the southern area of the Copthall Covert within our site boundary at Gate 1 on Harvil Road.

This will allow us to temporarily store and treat the soil that will be removed from the tunnels, before they are placed in their final location. This activity is regulated and approved by the Environment Agency, under the Noise Impact Assessment.

The location of the work is shown on the map below.

We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.