Temporary closure of Drayton Lane, Drayton Bassett
Work item: HS2-EW-LM-Ph1-Ar-No-N2-Traf-29-20/08/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Staffordshire
- Location
- Drayton Bassett
- Contractor
- BBV JV
- Type of works
- Road closure, Vegetation clearance
- Estimated Start Date
- 06/09/2021
- Estimated End Date
- 30/09/2021
What we are doing
There will be a road closure in place on Drayton Lane and the top of Shirral Drive from Monday 6 September until Thursday 30 September 2021. This follows similar work in 2020 and is to allow safe access along the roadside as part of HS2 works in the area, including vegetation removal. The road closure will be in place between 9:30am and 3:30pm with our teams on site one hour before and one hour after the works to set up and secure the site at the end of each day.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]