Temporary lane closures on Faraday Avenue and A446

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Prog-Works-7-23/08/2022

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Hams Hall
Contractor
BBV JV
Type of works
Utility works / surveys
Estimated Start Date
23/01/2023
Estimated End Date
03/02/2023

What we are doing

As we continue the construction of the new railway, we will need to undertake a range of surveys. The data from these surveys are used to progress the design of the railway. We need to carry out surveys to establish the exact depth and position of underground utilities. These works will involve digging trial holes within the roadside verges and central reservations of Faraday Avenue and the A446.

Our works will be completed between Monday 23 January to Friday 3 February 2023. During these works we will be installing phased single lane closures on Faraday Avenue and the A446 / Lichfield Road during the following dates and times:
• 9.30am to 3.30pm – Monday 23 January to Friday 27 January 2023.
• 8am to 1pm – Saturday 28 January 2023
• 9:30am to 3.30pm – Monday 30 January to Friday 3 February 2023

Pedestrian and access to frontages will be maintained at all times.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]