Temporary lane closures on Faraday Avenue and A446
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Prog-Works-7-23/08/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire
- Location
- Hams Hall
- Contractor
- BBV JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 23/01/2023
- Estimated End Date
- 03/02/2023
What we are doing
As we continue the construction of the new railway, we will need to undertake a range of surveys. The data from these surveys are used to progress the design of the railway. We need to carry out surveys to establish the exact depth and position of underground utilities. These works will involve digging trial holes within the roadside verges and central reservations of Faraday Avenue and the A446.
Our works will be completed between Monday 23 January to Friday 3 February 2023. During these works we will be installing phased single lane closures on Faraday Avenue and the A446 / Lichfield Road during the following dates and times:
• 9.30am to 3.30pm – Monday 23 January to Friday 27 January 2023.
• 8am to 1pm – Saturday 28 January 2023
• 9:30am to 3.30pm – Monday 30 January to Friday 3 February 2023
Pedestrian and access to frontages will be maintained at all times.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]