Temporary traffic lights on B485 Chesham Road, South Heath, Bucks

Work item: HS2-MW-Align-Ph1-Ar-Ce-C1-Traf-10-10/04/2025

Work Item Summary

Project Phase
Phase 1
Region
Buckinghamshire
Location
Chesham Road
Contractor
Align JV
Type of works
Lane closure, Traffic management
Estimated Start Date
06/05/2025
Estimated End Date
20/05/2025

What we are doing

We will be working to change the temporary bell mouth at our Chesham Road site, on the B485 Chesham Road, near South Heath to create the permanent site entrance and access road. The bell mouth will remain in the same location however, the width and alignment of the access road will be changed. Works will take place:

• From Tuesday 6 May to Tuesday 20 May 2025
• Monday to Saturday from 8am to 10pm (subject to approval)

A single lane closure on B485 Chesham Road is required to undertake these works, managed by temporary traffic lights across the bell mouth.