Thames Water works on The Greenway
Work item: HS2-MW-TW-Ph1-Ar-So-S1-Prog-works-1-18/10/2022 -2
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon, London
- Location
- The Greenway
- Worksite Name
- West Ruislip
- Contractor
- Thames Water
- Type of works
- Utility works / surveys
- Estimated Start Date
- 06/03/2023
- Estimated End Date
- 08/03/2023
What we are doing
Thames Water will be returning to The Greenway to carry out further work on the manhole outside number 43 next week.
Thames Water need to fill the manhole with concrete at this location. To do this, they will use a pump on Tuesday 7 March. The vehicle carrying concrete will need to reverse up part of the road and will have two banksmen directing it at all times, it will give way to other vehicles.
The road will remain open at all times, but as before it will be reduced to one lane for a short distance– give way signs will be in place. On road parking will be restricted in the immediate area but residents will be able to access their driveways at all times.
Footpaths on both sides of the road will remain open.
Work will take place on Tuesday 7 March. The traffic management will be setup on Monday 6 March and removed on Wednesday 8 March.