Tower crane base construction, Mandeville Road Vent Shaft site
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-Works-1-30/10/2024
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Location
- Mandeville Road
- Worksite Name
- Mandeville Road
- Contractor
- SCS JV
- Type of works
- Concrete break out, Concrete pours
- Estimated Start Date
- 18/11/2024
- Estimated End Date
- 20/12/2024
What we are doing
What we are doing
From 18 November to 20 December 2024, we will be clearing an area on site to build a concrete base for a tower crane due to arrive in January 2025.
A saw will be used to cut up the concrete surface and an excavator will then be used to break out the remainder of the platform. This will create some noise and vibration; we will minimise the breaking as much as possible.
To create the new base, we will dig down one metre and refill with concrete. Concrete will be delivered within core working hours. We will use an excavator and a vibrating plate. You may experience increased construction noise and vibration during these works.
Noise and vibration monitoring will be in place during the works. We will use water sprays to reduce dust and noise barriers around the machinery to help reduce noise. We would like to apologise in advance for any disruption or inconvenience this may cause.
For further details please find the link to the notification below.