Traffic management on A4091 Tamworth Road and Bodymoor Heath Lane

Work item: HS2-MW-BBV-Ph1-Ar-No-N2-Traf-20-11/09/2021

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Bodymoor Heath, Drayton Bassett
Contractor
BBV JV
Type of works
Survey, Traffic management
Estimated Start Date
23/11/2021
Estimated End Date
17/12/2021

What we are doing

We will be carrying out utility, topographical and drainage surveys. To complete the surveys a team of engineers will visit the location and record what is present in the area and carry out trial trenching, which will involve digging into the ground to establish what is underneath the surface. This will provide us with information which we need to assess as we develop our construction plans.
When these works will take place

These works will take place between 23 November and 17 December from 9.30 am to 3.30 pm. To complete these works safely we will install the following traffic management:
• Bodymoor Heath Lane – Tuesday 23 November to Friday 26 November (3-way traffic lights)
• A4091 Tamworth Road – Monday 29 November to Friday 3 December (Northbound closure from the Belfry Island to Church Lane)
• A4091 Tamworth Road – Monday 6 December to Friday 17 December excluding weekends (Single lane closures)
We will have a signed diversion route in place, where required, and access will be maintained to properties and businesses.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]