Traffic management on A4091 Tamworth Road and Bodymoor Heath Lane
Work item: HS2-MW-BBV-Ph1-Ar-No-N2-Traf-01-14/01/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire
- Location
- Bodymoor Heath
- Contractor
- BBV JV
- Type of works
- Survey, Traffic management
- Estimated Start Date
- 02/02/2022
- Estimated End Date
- 18/02/2022
What we are doing
The work we will be doing
We will be carrying out utility, topographical and drainage surveys. To complete the surveys a team of engineers will visit the location and record what is present in the area and carry out trial trenching, which will involve digging into the ground to establish what is underneath the surface. This will provide us with information which we need to assess as we develop our construction plans.
When these works will take place
These works will take place between 2 February to 4 February and 15 February to 18 February from 9.30 am to 3.30 pm. To complete these works safely we will install the following traffic management:
• Bodymoor Heath Lane 2nd – 4th February (3-way traffic lights)
• Tamworth Road / A4091 – 15th – 18th February (Lane closures)
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]