Traffic management on Coventry Road, Cubbington
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-49-22/12/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire
- Location
- Cubbington
- Contractor
- BBV JV
- Type of works
- Road closure, Utility works / surveys
- Estimated Start Date
- 05/02/2024
- Estimated End Date
- 09/02/2024
What we are doing
We will be completing temporary utility diversions and connection works along Coventry Road. This is to facilitate the construction of the new overbridge. To ensure the safety of our public and workforce, we will be installing traffic management on Coventry Road between A445 Leicester Lane and Rugby Road.
We will be closing Coventry Road between A445 Leicester Lane and Rugby Road from 5 to 9 February 2024, from 9.30am to 3.30pm
Outside of these hours, there will be temporary traffic lights in operation to protect our working area. During peak times, these will be manually controlled to help the flow of traffic. Access to all properties will be maintained.
Our workforce may be on site up to one hour before and one hour after to set up and secure our equipment.