Traffic management on Hodgetts Lane. Burton Green

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-33-18/11/2021

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire, West Midlands
Location
Burton Green
Worksite Name
Hodgetts Lane
Contractor
BBV JV
Type of works
Survey, Traffic management
Estimated Start Date
17/01/2022
Estimated End Date
21/01/2022

What we are doing

Traffic management on Hodgetts Lane, Burton Green

BBV will be carrying out trial hole excavations in the existing verge of Hodgetts Lane, Burton Green. This is to identify existing utility services and carry out Ground Investigation (GI) surveys. GI is the examination and study of the soil, rocks and groundwater below the surface. A number of methods are used to obtain samples and to monitor and test them. For example, boreholes may be dug by hand around utility pipelines or by using a rig in more open areas.

To complete thes surveys safely from Monday 17 January 2022 until Friday 21 January 2022, we will be installing a single lane closure controlled by traffic lights on Hodgetts Lane. These lights will be operational from 8am until 6pm, our workforce maybe on site one hour before and one hour after to set up and secure our equipment.
Access to properties will be maintained during the works. There will be advanced warning signs placed in the area. These works are subject to weather conditions.