Traffic management on Stoneleigh Road, near Stoneleigh

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-06-04/10/2023

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Stoneleigh
Contractor
BBV JV
Type of works
Ecological surveys, Survey, Utility works / surveys
Estimated Start Date
27/11/2023
Estimated End Date
01/12/2023

What we are doing

We will be carrying out CCTV drainage and tree surveys and trial holes along the Stoneleigh Road. To carry out these works safely, two-way temporary traffic lights will be in place at the proposed location of the Farmers’ Market roundabout, please refer to the map on the notification.

The two-way temporary traffic lights will be in place from 27 November to 1 December 2023, from 9.30am to 3.30pm with manual control at all the times.