Traffic management, Rugby Road, Cubbington
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-17-23/02/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Warwickshire
- Location
- Cubbington
- Contractor
- BBV JV
- Type of works
- Road closure, Utility works / surveys
- Estimated Start Date
- 11/04/2023
- Estimated End Date
- 05/05/2023
What we are doing
In line with the design, we will be continuing with utility works adjustments around Rugby Road. Specifically testing and reconnection of diverted utilities, removing telegraph poles and overhead cables. To carry out the works safely will require a full closure of Rugby Road, which will be done in two phases.
Phase one: 11 to 14 April 2023 – Full closure of Rugby Road from 8am to 6pm, with overnight two-way temporary traffic lights in place.
Phase two: 24 April to 5 May 2023 – Full closure of Rugby Road 8am to 6pm, with overnight and weekend including bank holiday temporary two-way traffic lights in place.
Access to all homes and businesses will be maintained throughout. Our working hours will be from 8am to 6pm Monday to Friday.
Our workforce maybe on site one hour before and one hour after to set up and secure our equipment.