Work Item Summary
- Project Phase
- Phase 1
- Region
- Camden
- Location
- Hampstead Road
- Contractor
- SCS JV
- Type of works
- Trial Holes
- Estimated Start Date
- 16/06/2025
- Estimated End Date
- 30/06/2025
What we are doing
To inform the design of our utility works on Hampstead Road and ensure the route below is clear, we need to survey an area south of
Robert Street, close to the pedestrian crossing.
From 16 to 30 June Monday to Friday 8am to 6pm we will dig a trial hole in the eastern footpath and partially within MDjv’s (Mace Dragados) site boundary on Hampstead Road.
We will partially close the footpath and maintain pedestrian access at all times. We will hand dig, survey, and then reinstate the area.
There may be some periods of increased noise as we complete this work. We apologise for any disruption these works may cause.